PROGRESS - PAGE 46 of 64
manxmines.com | Trevithick Society

 

Pages 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 | 23 | 24 | 25 | 26 | 27 | 28 | 29 | 30 | 31 | 32 | 33 | 34 | 35 | 36 | 37 | 38 | 39 | 40 | 41 | 42 | 43 | 44 | 45 | 46 | 47 | 48 | 49 | 50 | 51 | 52 | 53 | 54 | 55 | 56 | 57 | 58 | 59 | 60 | 61 | 62 | 63 | 64

Above: Work continues into the evening.

Above: The splash shroud in constructed on the scaffolding
This component will ensure that water entering the buckets
from the aqueduct wont splash out and onto the column.

Above: The shroud is given a protective coating

Above: The crew haul the splash shroud
up to the back of the wheel.

Above: The component is fitted in place and loosely
tacked to hold it whilst it is aligned into position .

Above: A heavily greased bolt is located on each
side to secure the structure to the shearlegs.

NEXT PAGE

 

BACK TO HOME PAGE

Copyright © snaefellwheel.com 2003/4